Solar System Union supplied sealThe Solar System UnionPublic institutions
Shared rights across worlds
Joint Gateway Scheduling identity
EMO.01 / unit
Joint Gateway Scheduling

EMO.01 / PUBLIC SERVICE NETWORK

Joint Gateway Scheduling

Reconcile accepted Earth and lunar gateway slots with accountable missed-connection duties.

EMO.01unitEarth public services

Joint Gateway Scheduling / public remit

Reconcile accepted Earth and lunar gateway slots with accountable missed-connection duties.

Receiving role
Joint Gateway Scheduling assessment lead
Public counterpart
Earth-Moon Operations

Choose your route

Office output: Joint gateway scheduling agreement

Assessment file: Joint gateway scheduling agreement

  • Earth gateway acceptance
  • lunar gateway acceptance
  • revised connection sequence

Read the joint gateway scheduling agreement specification →

A difficult joint gateway scheduling case

Illustrative case / EMO.01

A lunar receiving slot changes after Earth departure has been accepted; reconcile the actual two-sided schedule and passenger assistance.

Reporting and specialist powers

Competent parent
Earth-Moon Operations
Local public authority
Earth Administration
Receiving evidence
Earth gateway acceptance; lunar gateway acceptance; revised connection sequence
Assessment question
A lunar receiving slot changes after Earth departure has been accepted

Public records and accountability

EMO.01/REG
Records and reasoned determinations

Joint gateway scheduling agreement

EMO.01/CONTACT
Contact the competent office

Accessible assistance, evidence alternatives, institutional handoffs and review.